As the water level of the Pong dam on Beas rose by over two feet on Monday, the Bhakra Beas Management Board (BBMB) opened the floodgates releasing 13,848 cusecs of water, officials said
SD Sharma, chief engineer, Beas Satluj Link project (BSL project)-Sundernagar, who was holding the charge of Member Irrigation in BBMB, was repatriated back to parent organisation Haryana Irrigation on Monday
BBMB held a technical committee meeting in Chandigarh with Punjab, Haryana, Rajasthan, Himachal Pradesh and Delhi to work out a strategy for controlled release of water