[
msedcl
]Latest from msedcl
MSEDCL undertakes projects worth ₹ 7,347cr in Pune
The allocated funds will be utilized for infrastructure improvements, including the installation of smart meters and feeder isolation, aiming to reduce losses and ensure a more efficient power distribution system, said official

MSEDCL appeals to consumers to use app for transformer repairs
MSEDCL has streamlined its processes, ensuring that defective transformers are replaced within a maximum of three days after receiving reported incidents through the mobile app, said official

MSEDCL disconnects 1,251 unauthorised power connections in one day on Nov 4
In so doing, the MSEDCL has brought to light 993 power thefts (hooking up electricity wires and tampering with meters) amounting to ₹84 lakh

Pune Circle of MSEDCL replaces wire mesh fences with fibre plastic ones on pilot basis
Due to rusting, breakage, bending and theft of these iron fences however, the MSEDCL was forced to constantly renew them

MSEDCL engineer, lineman booked for negligence after labourer became disabled
The accused have been identified as section engineer Siddharth Dongre and lineman Arjun Chavan. “The contract labourer, Salman Muzaffar Bhivankar, 32, working at the Mahape MIDC office of MSEDCL, lost both his hands and has been permanently disabled due to the negligence of the duo,” an officer from MIDC police station said
